PROJECTS .

Breakwater Valencia Protection Works

  • 172
  • 172
  • 172
  • 172
CLIENT:
YEAR:
2015
Breakwater Valencia Protection Works .

Project: Breakwater for protection works.

Client: U.T.E. Obras de abrigo (SACYR, CYES,) Location: Port of Valencia.

3 Sided formwork with max progression of 11 m. Progression is carried out with formwork pressure.

Features: - hydraulic opening. - Surface vibration method.