PROJECTS .

Ibiza truss UTE MUELLES BOTAFOC

  • 67
  • 67
  • 68
  • 68
  • 68
  • 69
  • 37
  • 37
  • 37
  • 37
  • 37
  • 37
  • 37
  • 37
  • 37
CLIENT:
YEAR:
2011 to 2012
Ibiza truss UTE MUELLES BOTAFOC .

Mixed truss system, combining floating formwork and self-launching truss formwork.

Formwork allowed for 30 m wide and up to 19 m long sections in weekly cycles.
Client: UTE MUELLES BOTAFOC

CLIENT:
YEAR:
2015
Floating formwork Port (Fogo Cabo Verde Island) .

Self-contained equipment with hydraulic opening system, active buoyancy, and passing rods release system.

CLIENT:
YEAR:
2015
Single-arm Gripper Sines .

Single-arm friction gripper for lifting 70 ton blocks

CLIENT:
YEAR:
2011
Shoulder Formwork Protection Works Valencia .

Shoulder Formwork for protection works. 3 Sided formwork with max progression of 11 m

Features:

- Hydraulic opening.

- Surface vibration method